Skip to content

News

Environmental control is part of production

Matbuot xizmati Production
Water and environmental control works
Water and environmental control works

At HMP-2 water, air and waste are not a side press topic. They are run with the process chain and laboratory control.

Hydrometallurgy does not run without water, reagents and heat. Environmental control at HMP-2 is therefore not an add-on programme — it is a measured part of production. Sample, log and line of responsibility are kept as they are in safety.

The press office explains the general order on environment. Specific monitoring figures are issued through the relevant state reporting and the combinat’s official channels. Approximate numbers are not published on this portal.

The approach does not shrink openness; it holds accuracy. A wrong figure damages the brand and sends a false signal to the workforce.

For further questions journalists may send an official request. Answers are given with the source named.

Published: 23.07.2026

Back to list